![]() ![]() Almost 19,000 feet of that line was 30-inch Fastite, and 8,080 feet of that pipe is lined with Protecto 401 ceramic epoxy lining. Almost 25,000 feet of AMERICAN Fastite and Flex-Ring ductile iron pipe were installed to connect the base’s wastewater system with CWW. You put their pipe in the ground and forget about it.- CWW’s Steve DavisĪMERICAN supplied more than 25,000 feet of 30-inch ductile iron pipe – mostly Fastite – for work that connected Fort Benning’s water supply with the CWW system. “We’re really into life-cycle costs, and that’s one of the reasons we like AMERICAN. And Flex-Ring minimizes the risks of our having to go back to this crossing for repairs or maintenance in the future.- CWW Director of Engineering Steve Davis on an installation that crossed Upatoi Creek “AMERICAN’s Flex-Ring pipe provided strength and durability, and its generous joint deflection gave us restraint without having to use thrust blocks on the creek crossing. The company is based in Columbus, Georgia. The company supplies drinking water and provides wastewater treatment. Founded in 1903, Columbus Water Works provides utility services for the residents of Columbus, Georgia. Hailey, commenting on AMERICAN ductile iron pipe, which was installed via a bridge crossing Upatoi Creek Columbus Water Works Profile and History. Anytime we have an opportunity to use ductile iron pipe, we use AMERICAN.- Mike Rast, project manager for contractor W.L. ![]() The special lining they use for sewer pipe just adds to the longevity. “It’s a bulletproof pipe, and we think it’s the best product out there. Contractors were Gordy Construction (Columbus, Ga.) and W.L. Columbus Water Works is part of the Energy, Utilities & Waste industry, and located in Georgia, United States. Providing services to Fort Benning is expected to increase the peak wastewater discharge by 4.5 MGD and peak water demand by 6.8 MGD.Įngineers included Jordan, Jones and Goulding (Atlanta) and CH2MHill (Montgomery, Ala.). Steven Adams has been working as a Mechanical Technician II at Columbus Water Works for 3 years. The utility treats an average of 28 MGD of wastewater. CWW’s water treatment capacity is 90 million gallons a day (MGD) with average daily usage at 32 MGD. The base contributes more than $750 million to the area’s economy each year, and that number will surpass $1 billion with the relocation of the Army’s Armor Training School from Fort Knox, Ky., to Fort Benning.įounded in 1902, CWW serves more than 65,000 metered accounts within a population of 228,000. HaileyĮstablished in 1918, Fort Benning employs roughly 35,000 military and civilian personnel, making it the largest employer in Columbus. “ Anytime we have an opportunity to use ductile iron pipe, we use AMERICAN.” Mike Rast, Project Manager for Contractor W.L. Fort Benning’s water and wastewater systems were subsequently connected with CWW’s, and several large upgrades were begun. Attention persons with food allergies to wheat, soy, eggs, milk, peanuts, tree nuts, fish, and shellfish: Although the staff at Market District takes. The Columbus Water Works (CWW) and Fort Benning signed an agreement in 2004 calling for CWW to provide the military base water and wastewater services for 50 years.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |